Share
Upper Columbia Basin Network Limber Pine Community Dynamics 2012 Annual Monitoring Report: Craters of the Moon National Monument and Preserve: Natural (in English)
Devin S. Stucki
(Author)
·
Thomas J. Rodhouse
(Author)
·
Createspace Independent Publishing Platform
· Paperback
Upper Columbia Basin Network Limber Pine Community Dynamics 2012 Annual Monitoring Report: Craters of the Moon National Monument and Preserve: Natural (in English) - Rodhouse, Thomas J. ; National Park Service ; Stucki, Devin S.
$ 10.63
$ 13.29
You save: $ 2.66
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My WishlistsIt will be shipped from our warehouse between
Wednesday, July 03 and
Thursday, July 04.
You will receive it anywhere in United States between 1 and 3 business days after shipment.
Synopsis "Upper Columbia Basin Network Limber Pine Community Dynamics 2012 Annual Monitoring Report: Craters of the Moon National Monument and Preserve: Natural (in English)"
In 2009, the authors initiated a small pilot survey of six limber pine stands in CRMO following the Interagency Whitebark Pine Monitoring Protocol for the Greater Yellowstone Ecosystem (Greater Yellowstone Whitebark Pine Monitoring Working Group [hereafter referred to as GYWPMWG] 2007). No blister rust was found during that survey, although mountain pine beetle galleries were found in several trees, and dwarf mistletoe was ubiquitous. In 2010 the authors tested a draft version of the protocol currently being used by the Upper Columbia Basin Network (UCBN), as well as the Klamath Network (KLMN) and Sierra Nevada Network (SIEN; McKinney et al. 2012). In 2011 the authors implemented the first full panel of 30 plots, plus two oversamples, following approval of the McKinney et al. (2012) protocol. Results from 2011 are reported in Stucki and Rodhouse (2012). This report presents the results for the second full panel of 30 plots established and surveyed in August 2012. Note that panel 2 includes the two oversample plots that were established in 2011. This is the second formal year of protocol implementation, and the permanent plots established in 2012 represent the second of 3 panels of plots that will be monitored into the future.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.
✓ Producto agregado correctamente al carro, Ir a Pagar.