Share
Upgrading of High Moisture Low Rank Coal: to Hydrogen and Methane (in English)
$ 30.93
$ 36.72
You save: $ 5.79
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My WishlistsIt will be shipped from our warehouse between
Friday, June 28 and
Monday, July 01.
You will receive it anywhere in United States between 1 and 3 business days after shipment.
Synopsis "Upgrading of High Moisture Low Rank Coal: to Hydrogen and Methane (in English)"
The C2H upgrade project developed a new process for upgrading high moisture low rank brown coals yielding two valuable products: - a H2-rich fuel gas which can be used for high efficient power generation in a combined cycle or as a natural gas substitute; - a pre-calcined feed for a cement clinker kiln consisting of CaO, CaSO4 and coal ash. The C2H upgrade process consists of two core reactors: (i) a steam gasifer with in situ CO2 capture by CaO, and (ii) a sorbent regenerator with the possibility to produce a separate CO2 stream. The project evaluated the necessary aspects of process development. Characterisation of coals and CaO-based sorbents: A European geological survey produced suitable locations for a C2H plant. A methodology for evaluation of calcium-based sorbents was developed. Pilot scale gasification: Testing on three different reactor types was successfully completed (ABFB, PBFB, Rotary Kiln). A H2-rich (>85 vol. %) and CO2-lean gas with low tar content (
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.
✓ Producto agregado correctamente al carro, Ir a Pagar.