Libros importados hasta 50% OFF + Envío Gratis a todo USA  Ver más

menu

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Transportation: Florida's Sunshine Skyway Bridge-Design and Construction Concerns: Rced-85-32 (in English)
Type
Physical Book
Publisher
Language
Inglés
Pages
44
Format
Paperback
Dimensions
24.6 x 18.9 x 0.2 cm
Weight
0.10 kg.
ISBN13
9781287184348

Transportation: Florida's Sunshine Skyway Bridge-Design and Construction Concerns: Rced-85-32 (in English)

U. S. Government Accountability Office ( ; U. S. Government Accountability Office ( (Author) · Bibliogov · Paperback

Transportation: Florida's Sunshine Skyway Bridge-Design and Construction Concerns: Rced-85-32 (in English) - U. S. Government Accountability Office ( ; U. S. Government Accountability Office (

Physical Book

$ 13.26

$ 15.75

You save: $ 2.49

16% discount
  • Condition: New
It will be shipped from our warehouse between Wednesday, July 31 and Thursday, August 01.
You will receive it anywhere in United States between 1 and 3 business days after shipment.

Synopsis "Transportation: Florida's Sunshine Skyway Bridge-Design and Construction Concerns: Rced-85-32 (in English)"

Pursuant to a congressional request, GAO discussed the construction of Florida's Sunshine Skyway Bridge. Specifically, GAO reported on the design process, federal and state efforts to ensure that the bridge is being built to specifications, and a group of technical concerns about the bridge. GAO found that Florida followed its consultant engineer contracting procedures, although it did not audit the accounting systems of 10 of the bridge designer's 11 subconsultants prior to awarding the contract. Post-award audits by the state of two of the largest subconsultant contracts found that their accounting systems did not adequately identify and segregate costs. This prompted the state to question over $11,000 in design costs. Florida also found in its post-award audit that a subconsultant realized a 122-percent profit from the contract when the state had projected that it would realize only a 12 percent profit. GAO found that federal and state agencies have made significant efforts to ensure that the bridge is being built to specifications. Regarding technical concerns, GAO found that: (1) the concrete was a quality concrete which would be subject to the normal deterioration process; (2) the weak soil composition of the area was adequately strengthened by the addition of extra foundation piles; and (3) the trestle design was approved as meeting ship impact and other specifications.

Customers reviews

More customer reviews
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Frequently Asked Questions about the Book

All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.

Questions and Answers about the Book

Do you have a question about the book? Login to be able to add your own question.

Opinions about Bookdelivery

More customer reviews