Share
Preliminary Assessment of Chloride Concentrations, Loads, and Yields in Selected Watersheds along the Interstate 95 Corridor, Southeastern Connecticut (in English)
U. S. Department Of The Interior (Author)
·
Createspace Independent Publishing Platform
· Paperback
Preliminary Assessment of Chloride Concentrations, Loads, and Yields in Selected Watersheds along the Interstate 95 Corridor, Southeastern Connecticut (in English) - U. S. Department of the Interior
$ 11.80
$ 14.75
You save: $ 2.95
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My WishlistsIt will be shipped from our warehouse between
Monday, July 01 and
Tuesday, July 02.
You will receive it anywhere in United States between 1 and 3 business days after shipment.
Synopsis "Preliminary Assessment of Chloride Concentrations, Loads, and Yields in Selected Watersheds along the Interstate 95 Corridor, Southeastern Connecticut (in English)"
Water-quality conditions were assessed to evaluate potential effects of road-deicer applications on stream-water quality in four watersheds along Interstate 95 (I-95) in southeastern Connecticut from November 1, 2008, through September 30, 2009. This preliminary study is part of a four-year cooperative study by the U.S. Geological Survey (USGS), the Federal Highway Administration (FHWA), and the Connecticut Department of Transportation (ConnDOT). Streamflow and water quality were studied at four watersheds-Four Mile River, Oil Mill Brook, Stony Brook, and Jordan Brook.