Share
Investigation of Equipment Failure Green Canyon Block 242, Well No.1 OCS-G 21788 (in English)
U. S. Department Of The Interior (Author)
·
Createspace Independent Publishing Platform
· Paperback
Investigation of Equipment Failure Green Canyon Block 242, Well No.1 OCS-G 21788 (in English) - U. S. Department of the Interior
$ 12.79
$ 15.99
You save: $ 3.20
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My WishlistsIt will be shipped from our warehouse between
Monday, July 01 and
Tuesday, July 02.
You will receive it anywhere in United States between 1 and 3 business days after shipment.
Synopsis "Investigation of Equipment Failure Green Canyon Block 242, Well No.1 OCS-G 21788 (in English)"
On November 25, 2003, the Application for Permit to Drill (APD) the exploratory well was approved by the Minerals Management Service (MMS); this application was subsequently modified and approved by MMS on July 15, 2004. Nexen Petroleum U.S.A. Inc. contracted Transocean Inc. to conduct the drilling operations of the Green Canyon 242 (OCS-G 21788) Well No. 1. The semi-submersible Rig Marianas, owned and operated by Transocean Inc., was moved and moored onto the well location on August 30, 2004.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.
✓ Producto agregado correctamente al carro, Ir a Pagar.