Libros importados hasta 50% OFF + Envío Gratis a todo USA  Ver más

menu

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 1 (in English)
Type
Physical Book
Language
Inglés
Pages
534
Format
Paperback
Dimensions
28.0 x 21.6 x 2.7 cm
Weight
1.22 kg.
ISBN13
9781499623383

Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 1 (in English)

Commission, U. S. Nuclear Regulatory (Author) · Createspace Independent Publishing Platform · Paperback

Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 1 (in English) - Commission, U. S. Nuclear Regulatory

Physical Book

$ 19.19

$ 23.99

You save: $ 4.80

20% discount
  • Condition: New
It will be shipped from our warehouse between Monday, July 08 and Tuesday, July 09.
You will receive it anywhere in United States between 1 and 3 business days after shipment.

Synopsis "Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 1 (in English)"

The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, "Early Site Permits") is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, "Standard Design Certifications") provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, "Combined Licenses") allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.

Customers reviews

More customer reviews
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Frequently Asked Questions about the Book

All books in our catalog are Original.
The book is written in English.
The binding of this edition is Paperback.

Questions and Answers about the Book

Do you have a question about the book? Login to be able to add your own question.

Opinions about Bookdelivery

More customer reviews