Share
Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing: Appendices A through L (in English)
Commission, U. S. Nuclear Regulatory (Author)
·
Createspace Independent Publishing Platform
· Paperback
Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing: Appendices A through L (in English) - Commission, U. S. Nuclear Regulatory
$ 17.59
$ 21.99
You save: $ 4.40
Choose the list to add your product or create one New List
✓ Product added successfully to the Wishlist.
Go to My WishlistsIt will be shipped from our warehouse between
Wednesday, July 17 and
Thursday, July 18.
You will receive it anywhere in United States between 1 and 3 business days after shipment.
Synopsis "Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing: Appendices A through L (in English)"
The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a "Framework" that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.